Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Brio Gold Preparing to Restart Operations at Santa Luz Mine
Brio Gold has announced positive results from a feasibility study of its plans to restart operations at its Santa Luz mine in Bahia state, Brazil. Santa Luz is a fully constructed open-pit operation that was placed on care and maintenance in 2014 and is currently in development for recommissioning in the second quarter of 2018. Plant throughput capacity is planned at 2.7 million metric tons per year (mt/y). At average overall recoveries of 84%, Santa Luz is expected to produce approximately 100,000 ounces per year (oz/y) of gold over a mine life of 10 years.
Brio Gold Preparing to Restart Operations at Santa Luz Mine
Brio Gold has announced positive results from a feasibility study of its plans to restart operations at its Santa Luz mine in Bahia state, Brazil. Santa Luz is a fully constructed open-pit operation that was placed on care and maintenance in 2014 and is currently in development for recommissioning in the second quarter of 2018. Plant throughput capacity is planned at 2.7 million metric tons per year (mt/y). At average overall recoveries of 84%, Santa Luz is expected to produce approximately 100,000 ounces per year (oz/y) of gold over a mine life of 10 years.
Brio Gold Preparing to Restart Operations at Santa Luz Mine
2017
Aufsatz (Zeitschrift)
Englisch
Brio Gold Studying Flowsheet Modifications for C1 Santa Luz
Online Contents | 2015
Trek Planning Restart of Aurizona Gold Mine
Online Contents | 2017
En designspäckad resa mot det nya lönsamma Brio.
Online Contents | 2006
|Restart scheduled for Mt Cattlin lithium mine
Online Contents | 2015
Trek Planning Restart of Aurizona Gola Mine
Online Contents | 2017