Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Development of hydraulic-fill dam construction in the Soviet Union
Conclusions Hydromechanization is characterized by continuity of all the excavation, transportation, and soil placement operations, which ensures high outputs and rates of construction of the structures.Under conditions of floodplains rivers and water-covered pits, or for underwater pits, the only possible type of mechanization of earthwork for dam and dike construction is hydromechanization.In the Soviet Union, new types of hydraulic-fill structures have been worked out and introduced, and improved hydraulic filling techniques have been developed. This has given rise to wide possibilities of use of hydromechanization in hydraulic construction.
Development of hydraulic-fill dam construction in the Soviet Union
Conclusions Hydromechanization is characterized by continuity of all the excavation, transportation, and soil placement operations, which ensures high outputs and rates of construction of the structures.Under conditions of floodplains rivers and water-covered pits, or for underwater pits, the only possible type of mechanization of earthwork for dam and dike construction is hydromechanization.In the Soviet Union, new types of hydraulic-fill structures have been worked out and introduced, and improved hydraulic filling techniques have been developed. This has given rise to wide possibilities of use of hydromechanization in hydraulic construction.
Development of hydraulic-fill dam construction in the Soviet Union
Melent'ev, V. A. (Autor:in)
1980
Aufsatz (Zeitschrift)
Englisch
BKL:
56.30
Wasserbau
Lokalklassifikation TIB:
770/6550/8000
Development of hydraulic-fill dam construction in the Soviet Union
Springer Verlag | 1980
|Construction of hydraulic turbines in Soviet Union
Engineering Index Backfile | 1954
|Subway construction in Soviet Union
Engineering Index Backfile | 1962
|Construction of hydraulic fill road embankment
Engineering Index Backfile | 1926
Hydraulic fill construction of Huffman Dam
Engineering Index Backfile | 1920