Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Determination of the maximum allowable cost of constructing small hydroelectric stations
Determination of the maximum allowable cost of constructing small hydroelectric stations
Determination of the maximum allowable cost of constructing small hydroelectric stations
Mukhammadiev, M. M. (Autor:in) / Kalashnikov, A. G. (Autor:in) / Sapaev, D. M. (Autor:in) / Turetskii, I. B. (Autor:in)
1995
Aufsatz (Zeitschrift)
Englisch
BKL:
56.30
Wasserbau
Lokalklassifikation TIB:
770/6550/8000
Determination of the Maximum Allowable Cost of Constructing Small Hydroelectric Stations
British Library Online Contents | 1995
|Determination of the maximum allowable cost of constructing small hydroelectric stations
Springer Verlag | 1995
|Elimination of cofferdams when constructing hydroelectric stations
Online Contents | 1988
|Elimination of cofferdams when constructing hydroelectric stations
Springer Verlag | 1988
|Possibilities of constructing hydroelectric stations — pumped storage stations in Armenia
Springer Verlag | 1989
|