A platform for research: civil engineering, architecture and urbanism
Determination of the maximum allowable cost of constructing small hydroelectric stations
Determination of the maximum allowable cost of constructing small hydroelectric stations
Determination of the maximum allowable cost of constructing small hydroelectric stations
Mukhammadiev, M. M. (author) / Kalashnikov, A. G. (author) / Sapaev, D. M. (author) / Turetskii, I. B. (author)
1995
Article (Journal)
English
BKL:
56.30
Wasserbau
Local classification TIB:
770/6550/8000
Determination of the Maximum Allowable Cost of Constructing Small Hydroelectric Stations
British Library Online Contents | 1995
|Determination of the maximum allowable cost of constructing small hydroelectric stations
Springer Verlag | 1995
|Elimination of cofferdams when constructing hydroelectric stations
Online Contents | 1988
|Elimination of cofferdams when constructing hydroelectric stations
Springer Verlag | 1988
|Possibilities of constructing hydroelectric stations — pumped storage stations in Armenia
Springer Verlag | 1989
|