Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Possibilities for Optimizing the Self-Starting Process of Auxiliary Electric Motors at a Nuclear Power Plant
The existing technique of switching on the auxiliary reserve network of an NPP formulates the switch-on commands directly after a shutdown. Due to delay in activating the automatic switch, the command is completed with a certain time delay. The nature of the subsequent processes is not very predictable. It is proposed to determine, based on developed computer models of the actual equipment, the moments of formation of the reserve activation commands, thus ensuring smaller perturbations at the subsequent switch-on.
Possibilities for Optimizing the Self-Starting Process of Auxiliary Electric Motors at a Nuclear Power Plant
The existing technique of switching on the auxiliary reserve network of an NPP formulates the switch-on commands directly after a shutdown. Due to delay in activating the automatic switch, the command is completed with a certain time delay. The nature of the subsequent processes is not very predictable. It is proposed to determine, based on developed computer models of the actual equipment, the moments of formation of the reserve activation commands, thus ensuring smaller perturbations at the subsequent switch-on.
Possibilities for Optimizing the Self-Starting Process of Auxiliary Electric Motors at a Nuclear Power Plant
Krutikov, K. K. (Autor:in) / Rozhkov, V. V. (Autor:in) / Butrimov, S. G. (Autor:in) / Ivanov, V. N. (Autor:in)
2018
Aufsatz (Zeitschrift)
Englisch