Possibilities for Optimizing the Self-Starting Process of Auxiliary Electric Motors at a Nuclear Power Plant
The existing technique of switching on the auxiliary reserve network of an NPP formulates the switch-on commands directly after a shutdown. Due to delay in activating the automatic switch, the command is completed with a certain time delay. The nature of the subsequent processes is not very predictable. It is proposed to determine, based on developed computer models of the actual equipment, the moments of formation of the reserve activation commands, thus ensuring smaller perturbations at the subsequent switch-on.
Possibilities for Optimizing the Self-Starting Process of Auxiliary Electric Motors at a Nuclear Power Plant
The existing technique of switching on the auxiliary reserve network of an NPP formulates the switch-on commands directly after a shutdown. Due to delay in activating the automatic switch, the command is completed with a certain time delay. The nature of the subsequent processes is not very predictable. It is proposed to determine, based on developed computer models of the actual equipment, the moments of formation of the reserve activation commands, thus ensuring smaller perturbations at the subsequent switch-on.
Possibilities for Optimizing the Self-Starting Process of Auxiliary Electric Motors at a Nuclear Power Plant
Krutikov, K. K. (Autor:in) / Rozhkov, V. V. (Autor:in) / Butrimov, S. G. (Autor:in) / Ivanov, V. N. (Autor:in)
Power Technology and Engineering ; 51 ; 719-727
01.03.2018
9 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
nuclear power plant , auxiliary circuits of power plants , electric motors , braking on rundown , self-starting of sectional electric motors , automatic reserve switch-on , computer models Engineering , Energy Technology , Power Electronics, Electrical Machines and Networks , Renewable and Green Energy , Geoengineering, Foundations, Hydraulics