Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Electrical Resistivity Tomography study above inaccessible old mine workings for safe erection of high voltage electricity power transmission terrestrial towers: a case study
Electrical Resistivity Tomography study above inaccessible old mine workings for safe erection of high voltage electricity power transmission terrestrial towers: a case study
Electrical Resistivity Tomography study above inaccessible old mine workings for safe erection of high voltage electricity power transmission terrestrial towers: a case study
Bull Eng Geol Environ
Bharti, Abhay Kumar (Autor:in) / Prakash, Amar (Autor:in) / Oraon, Sandip (Autor:in) / Jaiswal, Prerna (Autor:in) / Mandal, Sujit Kumar (Autor:in)
01.10.2024
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Foundations for transmission line towers and tower erection
Engineering Index Backfile | 1915
|Erection of ultra-high voltage power transmission lines
Tema Archiv | 1993
|Slipforms accelerate erection of concrete towers
Engineering Index Backfile | 1964
|