Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Performance of a deep top-down zoned pit-in-pit excavation close to existing metro lines through winter
Performance of a deep top-down zoned pit-in-pit excavation close to existing metro lines through winter
Performance of a deep top-down zoned pit-in-pit excavation close to existing metro lines through winter
Front. Struct. Civ. Eng.
Cao, Wenxin (Autor:in) / Jia, Pengjiao (Autor:in) / Ni, Pengpeng (Autor:in) / Zhao, Wen (Autor:in) / Cheng, Cheng (Autor:in) / Wang, Fei (Autor:in)
Frontiers of Structural and Civil Engineering ; 18 ; 1680-1697
01.11.2024
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Zoned Excavation of an Oversized Pit Close to an Existing Metro Line in Stiff Clay: Case Study
Online Contents | 2015
|Zoned Excavation of an Oversized Pit Close to an Existing Metro Line in Stiff Clay: Case Study
British Library Online Contents | 2015
|Excavation construction method for river-following deep groove close to existing structure
Europäisches Patentamt | 2023
|