A platform for research: civil engineering, architecture and urbanism
Performance of a deep top-down zoned pit-in-pit excavation close to existing metro lines through winter
Performance of a deep top-down zoned pit-in-pit excavation close to existing metro lines through winter
Performance of a deep top-down zoned pit-in-pit excavation close to existing metro lines through winter
Front. Struct. Civ. Eng.
Cao, Wenxin (author) / Jia, Pengjiao (author) / Ni, Pengpeng (author) / Zhao, Wen (author) / Cheng, Cheng (author) / Wang, Fei (author)
Frontiers of Structural and Civil Engineering ; 18 ; 1680-1697
2024-11-01
Article (Journal)
Electronic Resource
English
Zoned Excavation of an Oversized Pit Close to an Existing Metro Line in Stiff Clay: Case Study
Online Contents | 2015
|Zoned Excavation of an Oversized Pit Close to an Existing Metro Line in Stiff Clay: Case Study
British Library Online Contents | 2015
|Excavation construction method for river-following deep groove close to existing structure
European Patent Office | 2023
|