Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Technical Files
The original record of pipe jacking should include the following: (1) Pipe jacking construction site survey form; (2) Back installation acceptance record; (3) Acceptance record of guide rail installation in foundation pit; (4) Pipe jacking construction site record sheet; (5) Pipe jacking construction measurement record sheet.
Technical Files
The original record of pipe jacking should include the following: (1) Pipe jacking construction site survey form; (2) Back installation acceptance record; (3) Acceptance record of guide rail installation in foundation pit; (4) Pipe jacking construction site record sheet; (5) Pipe jacking construction measurement record sheet.
Technical Files
Wang, Lu (Autor:in) / Wu, Zhiguo (Autor:in) / Chen, Yong (Autor:in) / Wang, Zhaoquan (Autor:in) / Yan, Chunwen (Autor:in) / Tong, Taotao (Autor:in)
Technology Standard of Pipe Jacking ; Kapitel: 17 ; 169-170
23.09.2023
2 pages
Aufsatz/Kapitel (Buch)
Elektronische Ressource
Englisch
Europe: Midway Files Technical Report for Spring Valley
Online Contents | 2009
Online Contents | 2003
Online Contents | 2004
Online Contents | 2003
Online Contents | 2005