A platform for research: civil engineering, architecture and urbanism
Technical Files
The original record of pipe jacking should include the following: (1) Pipe jacking construction site survey form; (2) Back installation acceptance record; (3) Acceptance record of guide rail installation in foundation pit; (4) Pipe jacking construction site record sheet; (5) Pipe jacking construction measurement record sheet.
Technical Files
The original record of pipe jacking should include the following: (1) Pipe jacking construction site survey form; (2) Back installation acceptance record; (3) Acceptance record of guide rail installation in foundation pit; (4) Pipe jacking construction site record sheet; (5) Pipe jacking construction measurement record sheet.
Technical Files
Wang, Lu (author) / Wu, Zhiguo (author) / Chen, Yong (author) / Wang, Zhaoquan (author) / Yan, Chunwen (author) / Tong, Taotao (author)
Technology Standard of Pipe Jacking ; Chapter: 17 ; 169-170
2023-09-23
2 pages
Article/Chapter (Book)
Electronic Resource
English
Europe: Midway Files Technical Report for Spring Valley
Online Contents | 2009
Online Contents | 2003
Online Contents | 2004
Online Contents | 2003
Online Contents | 2003