Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Site control and supervision
Abstract However carefully the pipejacking or microtunnelling project is designed, the materials specified and the contract drafted it can still fail if the implementation is not properly planned and controlled. The prime responsibility for successful installation rests with the contractor.
Site control and supervision
Abstract However carefully the pipejacking or microtunnelling project is designed, the materials specified and the contract drafted it can still fail if the implementation is not properly planned and controlled. The prime responsibility for successful installation rests with the contractor.
Site control and supervision
C. Eng., Eur. Ing. Thomson, James C. (Autor:in)
Pipejacking and Microtunnelling ; 228-237
01.01.1993
10 pages
Aufsatz/Kapitel (Buch)
Elektronische Ressource
Englisch
TIBKAT | 1984
|Guidelines for the Site Supervision
Wiley | 2006
|Optimization of Construction Site Safety Supervision Activities
TIBKAT | 2016
|Architectural supervision on site A. A. Macfarlane
UB Braunschweig | 1973
|On Position and Function of On-Site Supervision
British Library Conference Proceedings | 2014
|