A platform for research: civil engineering, architecture and urbanism
Site control and supervision
Abstract However carefully the pipejacking or microtunnelling project is designed, the materials specified and the contract drafted it can still fail if the implementation is not properly planned and controlled. The prime responsibility for successful installation rests with the contractor.
Site control and supervision
Abstract However carefully the pipejacking or microtunnelling project is designed, the materials specified and the contract drafted it can still fail if the implementation is not properly planned and controlled. The prime responsibility for successful installation rests with the contractor.
Site control and supervision
C. Eng., Eur. Ing. Thomson, James C. (author)
Pipejacking and Microtunnelling ; 228-237
1993-01-01
10 pages
Article/Chapter (Book)
Electronic Resource
English
TIBKAT | 1984
|Guidelines for the Site Supervision
Wiley | 2006
|Optimization of Construction Site Safety Supervision Activities
TIBKAT | 2016
|Architectural supervision on site A. A. Macfarlane
UB Braunschweig | 1973
|On Position and Function of On-Site Supervision
British Library Conference Proceedings | 2014
|