Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Hydraulic turbines for the Sayano-Shushenskoe hydroelectric station
Conclusions 1. The turbine equipment developed for the Sayano-Shushenskoe hydroelectric station, having an efficiency of 96.0% and specific metal consumption of 1.9 kg/kW, is a new stage in the development of Soviet hydroturbine construction. 2. The turbine equipment permitted a rational layout of the powerhouse, was conveniently transportable, and made it possible to start operating the units ahead of schedule. Furthermore, it is amenable to large-block assembly and meets the requirements of industrial design.
Hydraulic turbines for the Sayano-Shushenskoe hydroelectric station
Conclusions 1. The turbine equipment developed for the Sayano-Shushenskoe hydroelectric station, having an efficiency of 96.0% and specific metal consumption of 1.9 kg/kW, is a new stage in the development of Soviet hydroturbine construction. 2. The turbine equipment permitted a rational layout of the powerhouse, was conveniently transportable, and made it possible to start operating the units ahead of schedule. Furthermore, it is amenable to large-block assembly and meets the requirements of industrial design.
Hydraulic turbines for the Sayano-Shushenskoe hydroelectric station
Belov, V. S. (Autor:in) / Gamus, I. M. (Autor:in) / Kondrat'ev, Yu. S. (Autor:in) / Skrylev, I. A. (Autor:in) / Slyn'ko, V. S. (Autor:in)
Hydrotechnical Construction ; 13 ; 121-124
01.02.1979
4 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Hydraulic turbines for the Sayano-Shushenskoe hydroelectric station
Online Contents | 1979
|Penstocks of the Sayano-Shushenskoe hydroelectric station
Springer Verlag | 1978
|Generators of the Sayano-Shushenskoe hydroelectric station
Online Contents | 1994
|Penstocks of the Sayano-Shushenskoe hydroelectric station
Online Contents | 1978
|Generators of the Sayano-Shushenskoe Hydroelectric Station
British Library Online Contents | 1994
|