Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Track Settlements
Railway track will settle due to the permanent deformation in the ballast and underlying soil.
A new track is straight and well levelled. After having been used some time, the track loses its perfect track geometry due to the train traffic. The severity of the settlement depends mainly on the quality and the behaviour of the ballast, the sub-ballast, and the subgrade.
Track Settlements
Railway track will settle due to the permanent deformation in the ballast and underlying soil.
A new track is straight and well levelled. After having been used some time, the track loses its perfect track geometry due to the train traffic. The severity of the settlement depends mainly on the quality and the behaviour of the ballast, the sub-ballast, and the subgrade.
Track Settlements
Springer Tracts on Transportation, Traffic
Tzanakakis, Konstantinos (Autor:in)
01.01.2013
2 pages
Aufsatz/Kapitel (Buch)
Elektronische Ressource
Englisch
Track settlements at bridge approache
IuD Bahn | 2009
|Method for estimating railroad track settlements due to dynamic traffic loads
BASE | 2005
|Method for estimating railroad track settlements due to dynamic traffic loads
British Library Conference Proceedings | 2005
|Transforming informal settlements to sustainable settlements
British Library Online Contents | 2002
DataCite | 1913
|