Placing the enclosing dikes for the foundation of the Lower-Kama hydroelectric station
Conclusions 1. The utilization of coarse-material suction dredges for the construction of foundation pits from a supply of developed materials in the underwater portions for use in dikes, not only speeds up the placement operation, but has a significant economic effect as well. 2. During construction of the foundation pits, based on the hydromechanics of soils with a gravel content up to 30%, it was found necessary to design the pit with underwater side slopes not steeper than 1 ∶ 3.
Placing the enclosing dikes for the foundation of the Lower-Kama hydroelectric station
Conclusions 1. The utilization of coarse-material suction dredges for the construction of foundation pits from a supply of developed materials in the underwater portions for use in dikes, not only speeds up the placement operation, but has a significant economic effect as well. 2. During construction of the foundation pits, based on the hydromechanics of soils with a gravel content up to 30%, it was found necessary to design the pit with underwater side slopes not steeper than 1 ∶ 3.
Placing the enclosing dikes for the foundation of the Lower-Kama hydroelectric station
Buevich, V. A. (Autor:in)
Hydrotechnical Construction ; 1 ; 617-620
01.07.1967
4 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Placing the enclosing dikes for the foundation of the Lower-Kama hydroelectric station
Online Contents | 1967
|Construction of the Lower Kama hydroelectric station
Springer Verlag | 1978
|Construction of the Lower Kama hydroelectric station
Online Contents | 1978
|Cutoff wall in the foundation pit of the Lower Kama hydroelectric station
Online Contents | 1973
|Cutoff wall in the foundation pit of the Lower Kama hydroelectric station
Springer Verlag | 1973
|