Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Cheon-Sa Bridge (Section I), Hybrid Cable-Stayed Bridge Anchored to FCM Pier-Table
Cheon-Sa Bridge (Section I), completed and opened traffic in 2019, is a FCM (free cantilever method)-anchored hybrid two-pylon cable-stayed bridge with a main span of 510 m. A distinct feature of the bridge is its high (195 m) and low (135 m) pylons with three bundles of cables anchored to the pier-tables of side spans. This exceptional structural scheme gives drastic improvement of structural safety during construction stage as well as enhancement of bridge aesthetics. The link is directly exposed to the Yellow Sea and the site is characterized by strong winds during typhoon events.
Cheon-Sa Bridge (Section I), Hybrid Cable-Stayed Bridge Anchored to FCM Pier-Table
Cheon-Sa Bridge (Section I), completed and opened traffic in 2019, is a FCM (free cantilever method)-anchored hybrid two-pylon cable-stayed bridge with a main span of 510 m. A distinct feature of the bridge is its high (195 m) and low (135 m) pylons with three bundles of cables anchored to the pier-tables of side spans. This exceptional structural scheme gives drastic improvement of structural safety during construction stage as well as enhancement of bridge aesthetics. The link is directly exposed to the Yellow Sea and the site is characterized by strong winds during typhoon events.
Cheon-Sa Bridge (Section I), Hybrid Cable-Stayed Bridge Anchored to FCM Pier-Table
Kim, Woo JongPresident, CEO (Autor:in) / Cho, Kyung SikPresident (Autor:in) / Cho, Eu KyeongSenior Vice President (Autor:in) / Kim, Ji SanVice President (Autor:in) / Yang, Kyung-JinGeneral Manager (Autor:in) / Choi, Myeong-SuGeneral Manager (Autor:in)
Structural Engineering International ; 31 ; 427-430
03.07.2021
4 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Example 7: Strut-and-tie model cable stayed bridge pier table
British Library Conference Proceedings | 2002
|Europäisches Patentamt | 2020
|NEW BRIDGE STRUCTURE-SELF-ANCHORED CABLE-STAYED SUSPENSION COMBINED BRIDGE
British Library Conference Proceedings | 2007
|Hybrid Vibration Control of Self-Anchored Cable-Stayed Suspension Bridge
British Library Conference Proceedings | 2014
|