Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Learning from experience in design cost estimating
The underlying reasons responsible for failure to learn in design cost estimating are considered. A model for aiding learning from experience in design cost estimating practice is presented. Analysis of historical cost data from seven UK design offices show that learning through the use of feedback data is insufficient.
Learning from experience in design cost estimating
The underlying reasons responsible for failure to learn in design cost estimating are considered. A model for aiding learning from experience in design cost estimating practice is presented. Analysis of historical cost data from seven UK design offices show that learning through the use of feedback data is insufficient.
Learning from experience in design cost estimating
Ogunlana, Olu (Autor:in)
Construction Management and Economics ; 9 ; 133-150
01.04.1991
18 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Design cost estimating , accuracy , learning , experience , feedback , stable , development , asterisk
Tunnel Cost Estimating—Sharing our Experience
TIBKAT | 2020
|Experiential learning in cost estimating
Taylor & Francis Verlag | 1994
|Experiential learning in cost estimating
British Library Online Contents | 1994
|Plant design and cost estimating
TIBKAT | 1986
|Interactive Cost Estimating During Design
British Library Conference Proceedings | 1994
|