Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Setting construction contract duration: Public projects in Saudi Arabia
A detailed survey of the public agencies revealed three patterns for setting CCD and the growing need for developing formal and systematic procedures.
Setting construction contract duration: Public projects in Saudi Arabia
A detailed survey of the public agencies revealed three patterns for setting CCD and the growing need for developing formal and systematic procedures.
Setting construction contract duration: Public projects in Saudi Arabia
Almohawis, Soliman A. (Autor:in) / Al-Sultan, Ahmad S. (Autor:in)
Building Research & Information ; 22 ; 211-213
01.07.1994
3 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Setting construction contract duration: public projects in Saudi Arabia
Online Contents | 1994
|Value engineering in public construction projects in Saudi Arabia
British Library Online Contents | 1996
|Value engineering in public construction projects in Saudi Arabia
Taylor & Francis Verlag | 1996
|Value engineering in public construction projects in Saudi Arabia
Online Contents | 1996
|Setting Highway Construction Contract Duration
ASCE | 2021
|