A platform for research: civil engineering, architecture and urbanism
Setting construction contract duration: Public projects in Saudi Arabia
A detailed survey of the public agencies revealed three patterns for setting CCD and the growing need for developing formal and systematic procedures.
Setting construction contract duration: Public projects in Saudi Arabia
A detailed survey of the public agencies revealed three patterns for setting CCD and the growing need for developing formal and systematic procedures.
Setting construction contract duration: Public projects in Saudi Arabia
Almohawis, Soliman A. (author) / Al-Sultan, Ahmad S. (author)
Building Research & Information ; 22 ; 211-213
1994-07-01
3 pages
Article (Journal)
Electronic Resource
English
Setting construction contract duration: public projects in Saudi Arabia
Online Contents | 1994
|Value engineering in public construction projects in Saudi Arabia
British Library Online Contents | 1996
|Value engineering in public construction projects in Saudi Arabia
Taylor & Francis Verlag | 1996
|Value engineering in public construction projects in Saudi Arabia
Online Contents | 1996
|Setting Highway Construction Contract Duration
ASCE | 2021
|