Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Hero Bridge is an extraordinarily huge bride across northern branch Ganjiang River, in the city of Nanchang. Main tower adopted single column slanted pylon space twist face back cable structure. Its construction is based on double-wall cofferdam method. The paper discuss thecalculation of key step and key position for the key technology in terms of double-wall cofferdam and platform underwater construction, Which include the design of the base construction and double-wall cofferdam,steel cofferdam construction, the calculation and checking of the cofferdam and so on.
Hero Bridge is an extraordinarily huge bride across northern branch Ganjiang River, in the city of Nanchang. Main tower adopted single column slanted pylon space twist face back cable structure. Its construction is based on double-wall cofferdam method. The paper discuss thecalculation of key step and key position for the key technology in terms of double-wall cofferdam and platform underwater construction, Which include the design of the base construction and double-wall cofferdam,steel cofferdam construction, the calculation and checking of the cofferdam and so on.
Double-Wall Cofferdam of Hero Bridge Calculation
Applied Mechanics and Materials ; 94-96 ; 560-563
08.09.2011
4 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Double-Wall Cofferdam of Hero Bridge Calculation
British Library Conference Proceedings | 2011
|Double-wall steel cofferdam construction process for bridge construction
Europäisches Patentamt | 2022
|Double-wall steel cofferdam structure construction method and double-wall steel cofferdam structure
Europäisches Patentamt | 2023
|Bridge double-wall cofferdam rapid sinking system and construction method
Europäisches Patentamt | 2023
|