Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Forward Horizontal Grouting Technology of Subway Station Ends
Guangzhou Metro Line 6 the 8th tender Tianhe Station tunnel shielding meet hole body fissure water is abundant, tunnel soil mass disintegrates easily when water permeate, consolidating with end-advancing horizontal grouting technique. By reasonable choice construction equipment, drilling location, double liquid grouting parameters to control the construction process, enhance process monitoring, get a good reinforcement effect; analyzed the prospects of the construction method.
Forward Horizontal Grouting Technology of Subway Station Ends
Guangzhou Metro Line 6 the 8th tender Tianhe Station tunnel shielding meet hole body fissure water is abundant, tunnel soil mass disintegrates easily when water permeate, consolidating with end-advancing horizontal grouting technique. By reasonable choice construction equipment, drilling location, double liquid grouting parameters to control the construction process, enhance process monitoring, get a good reinforcement effect; analyzed the prospects of the construction method.
Forward Horizontal Grouting Technology of Subway Station Ends
Advanced Materials Research ; 1065-1069 ; 364-367
11.12.2014
4 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Forward Horizontal Grouting Technology of Subway Station Ends
British Library Conference Proceedings | 2015
|Mortise grouting equipment for prefabricated subway station structure
Europäisches Patentamt | 2020
|Advancing type horizontal grouting construction method for intercity subway
Europäisches Patentamt | 2021
|Prefabricated assembly type subway station component grouting auxiliary device
Europäisches Patentamt | 2024
|Subway station side wall leakage water grouting system and method
Europäisches Patentamt | 2023
|