Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Study on Excavation Method of Tunnel with Super Cross-Section and Super Large Section Area Underpass Extra-High Building
Because double side drift excavation method named eye excavation method has been a mature and reliable excavation method, it has normally been used in tunnels with super cross-section and super large section area. However, the construction speed using this method is very slow. One of reasons is that the construction technology of this method would be more and complex. The other is that all construction workers, materials, equipment would be extremely difficult for their up and down, and that the ballast rock would have to be moved by artificial when the upper step of the middle guide hole would be excavated. In this paper, to speed up the process of excavating tunnel with super cross-section and super large section area underpass extra-high building, the elastic-plastic numerical simulations for the tunnel named Industry and Trade Station of the third line in Chongqing Rail Transit were made in four excavation methods conditions. The four excavation methods is respectively the double side drift excavation method to the first excavation in main building side, the double side drift excavation method to the first excavation in podium side, the single side drift excavation method in the upper step to the first excavation in main building side and the single side drift excavation method in the upper step to the first excavation in podium side. The main building is named Industry and Trade building with 22 floors. The results showed that the single side drift excavation method in the upper step could Insure the building and tunnel when the support measures were reasonable, that the guide hole beside the little surface load should firstly be excavated by whether double side drift excavation method or single side drift excavation method, and that these would provide a reference for some similar engineering.
Study on Excavation Method of Tunnel with Super Cross-Section and Super Large Section Area Underpass Extra-High Building
Because double side drift excavation method named eye excavation method has been a mature and reliable excavation method, it has normally been used in tunnels with super cross-section and super large section area. However, the construction speed using this method is very slow. One of reasons is that the construction technology of this method would be more and complex. The other is that all construction workers, materials, equipment would be extremely difficult for their up and down, and that the ballast rock would have to be moved by artificial when the upper step of the middle guide hole would be excavated. In this paper, to speed up the process of excavating tunnel with super cross-section and super large section area underpass extra-high building, the elastic-plastic numerical simulations for the tunnel named Industry and Trade Station of the third line in Chongqing Rail Transit were made in four excavation methods conditions. The four excavation methods is respectively the double side drift excavation method to the first excavation in main building side, the double side drift excavation method to the first excavation in podium side, the single side drift excavation method in the upper step to the first excavation in main building side and the single side drift excavation method in the upper step to the first excavation in podium side. The main building is named Industry and Trade building with 22 floors. The results showed that the single side drift excavation method in the upper step could Insure the building and tunnel when the support measures were reasonable, that the guide hole beside the little surface load should firstly be excavated by whether double side drift excavation method or single side drift excavation method, and that these would provide a reference for some similar engineering.
Study on Excavation Method of Tunnel with Super Cross-Section and Super Large Section Area Underpass Extra-High Building
Advanced Materials Research ; 250-253 ; 2057-2067
17.05.2011
11 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
British Library Conference Proceedings | 2011
|Method for large-section underground excavation underpass of existing subway station
Europäisches Patentamt | 2024
|Cross section structure jointly built by pedestrian crossing tunnel and underpass tunnel
Europäisches Patentamt | 2021
|Optimized Partition Scheme for Prefabricated Underpass with Large Cross Section
DOAJ | 2021
|Study on Surrounding Rock Deformation Discipline of Extra-Large Section Super-Shallow-Buried Tunnel
Trans Tech Publications | 2011
|