Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Stress Analysis of Closure Process of Continuous Rigid Frame Bridge
Theoretical analysis and finite element numerical simulation are done to calculateputing force and displacement under different closure orders of mid-span and side span. Furthermore, stress, horizontal displacement and deflection of bridge structure are analyzed. Closure scheme that construction mid-span firstly, then side span according to calculated launching force is proposed and discussed. Obvious advantage of the new scheme is construction with hanging basket and guiding beam instead of supporting frame. And the measures are simple, safe and reliable.
Stress Analysis of Closure Process of Continuous Rigid Frame Bridge
Theoretical analysis and finite element numerical simulation are done to calculateputing force and displacement under different closure orders of mid-span and side span. Furthermore, stress, horizontal displacement and deflection of bridge structure are analyzed. Closure scheme that construction mid-span firstly, then side span according to calculated launching force is proposed and discussed. Obvious advantage of the new scheme is construction with hanging basket and guiding beam instead of supporting frame. And the measures are simple, safe and reliable.
Stress Analysis of Closure Process of Continuous Rigid Frame Bridge
Applied Mechanics and Materials ; 303-306 ; 2919-2923
13.02.2013
5 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Influence of Closure Sequences on the Rigid Frame-Continuous Girder Bridge Closure
British Library Conference Proceedings | 2013
|The Confirmation of Closure Jacking Force in Continuous Rigid Frame Bridge
British Library Conference Proceedings | 2014
|Longitudinal pushing structure for closure section of continuous rigid frame bridge
Europäisches Patentamt | 2021
|The Confirmation of Closure Jacking Force in Continuous Rigid Frame Bridge
Trans Tech Publications | 2014
|Longitudinal pushing structure of closure segment of continuous rigid frame bridge
Europäisches Patentamt | 2016
|