Study on the Optimization of Public Construction Project Duration
This article gathers 16 factors which influence the duration of public construction project on the basis of research and analysis, and forms hierarchical relationships and causal relationships of the factors through improved interpretive structural model. Finally, comes up with several recommendations on the issue, further,the research and discussion on public construction project control and optimization of construction duration of our country are carried out.
Study on the Optimization of Public Construction Project Duration
This article gathers 16 factors which influence the duration of public construction project on the basis of research and analysis, and forms hierarchical relationships and causal relationships of the factors through improved interpretive structural model. Finally, comes up with several recommendations on the issue, further,the research and discussion on public construction project control and optimization of construction duration of our country are carried out.
Study on the Optimization of Public Construction Project Duration
Applied Mechanics and Materials ; 457-458 ; 1589-1592
31.10.2013
4 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Simulation of Construction Project Duration
ASCE | 2021
|Taylor & Francis Verlag | 2023
|Offshore wind project production system:reducing construction duration through planning
BASE | 2020
|Setting construction contract duration: Public projects in Saudi Arabia
Taylor & Francis Verlag | 1994
|