Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The Preparation and Research of Drilling Bitten Pile in Kunming Metro Engineering
In consider of construction characteristics of drilling bitten pile in Kunming metro engineering, this paper study on preparation and performance of super retarded concrete. Meanwhile, this paper find appropriate raw materials and mixing amount, which can meet construction requirement of high flowability and long setting time for this engineering. Combined theory with experiments, it lay the foundation of popularization and application of super retarded concrete to find the influence law of performance of super retarded concrete by mixing amount of all materials.
The Preparation and Research of Drilling Bitten Pile in Kunming Metro Engineering
In consider of construction characteristics of drilling bitten pile in Kunming metro engineering, this paper study on preparation and performance of super retarded concrete. Meanwhile, this paper find appropriate raw materials and mixing amount, which can meet construction requirement of high flowability and long setting time for this engineering. Combined theory with experiments, it lay the foundation of popularization and application of super retarded concrete to find the influence law of performance of super retarded concrete by mixing amount of all materials.
The Preparation and Research of Drilling Bitten Pile in Kunming Metro Engineering
Advanced Materials Research ; 1004-1005 ; 1585-1588
13.08.2014
4 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Online Contents | 2001
Online Contents | 2011
Pile foundation drilling device for civil engineering
Europäisches Patentamt | 2022
|Kinetic Membranous Structure, Kunming, China
British Library Online Contents | 2002
|Herr, wir bitten Dich um Fruchtbarkeit
DataCite | 2020
|