Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
CHAPTER 7 – Water Hammer and Surge: AWWA Steel Pipe Committee Report
This article presents Chapter 7, Water Hammer and Surge, of the AWWA Committee Report on the Design and Installation of Steel water Pipe. The chapter discusses basic relationships, checklist for pumping mains, general studies of water hammer control, standard allowances for water hammer, pressure rise calculations, and good practice.
CHAPTER 7 – Water Hammer and Surge: AWWA Steel Pipe Committee Report
This article presents Chapter 7, Water Hammer and Surge, of the AWWA Committee Report on the Design and Installation of Steel water Pipe. The chapter discusses basic relationships, checklist for pumping mains, general studies of water hammer control, standard allowances for water hammer, pressure rise calculations, and good practice.
CHAPTER 7 – Water Hammer and Surge: AWWA Steel Pipe Committee Report
Journal ‐ American Water Works Association ; 53 ; 1034-1044
01.08.1961
11 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Surge , Design , Steel Pipe , Pressure , Installation , AWWA , Pumping , Water Hammer