Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
CHAPTER 16 – Trenching, Pipelaying, and Backfilling: AWWA Steel Pipe Committee Report
This article presents Chapter 16, Trenching, Pipelaying, and Backfilling, of the AWWA Committee Report on the Design and Installation of Steel Water Pipe. The chapter discusses trenching, installation of pipe, hydrostatic test, allowable leakage, backfilling, sanitary precautions, freezing in pipelines, and warming of water in exposed pipelines.
CHAPTER 16 – Trenching, Pipelaying, and Backfilling: AWWA Steel Pipe Committee Report
This article presents Chapter 16, Trenching, Pipelaying, and Backfilling, of the AWWA Committee Report on the Design and Installation of Steel Water Pipe. The chapter discusses trenching, installation of pipe, hydrostatic test, allowable leakage, backfilling, sanitary precautions, freezing in pipelines, and warming of water in exposed pipelines.
CHAPTER 16 – Trenching, Pipelaying, and Backfilling: AWWA Steel Pipe Committee Report
Journal ‐ American Water Works Association ; 54 ; 1138-1155
01.09.1962
18 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Design , Freezing , Steel Pipe , Installation , Pipelines , Pipes