A platform for research: civil engineering, architecture and urbanism
Ground improvement during excavation of the Madrid Underground's Line 1 extension
Ground improvement during excavation of the Madrid Underground's Line 1 extension
Ground improvement during excavation of the Madrid Underground's Line 1 extension
Arnaiz, M. (author) / Oteo, C. (author) / Ferrer, P. (author) / Simic, D. (author) / Alten, T. / Norwegian Tunnelling Society (NFF) / International Tunnelling Association
World tunnel congress, Vol 2; Communication tunnels; miscellaneous including water tunnels; mechanised tunnelling ; 1999 ; Oslo
1999-01-01
8 pages
Held during the 25th general assembly of the International Tunnelling Association
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Increasing capacity on London Underground's Central Line
British Library Conference Proceedings | 2001
|British Library Conference Proceedings | 2007
|Shadowing the Thames in green - Focus on London Underground's District Line
Online Contents | 2007
GROUND IMPROVEMENT STRUCTURE AND GROUND EXCAVATION METHOD
European Patent Office | 2017
|