A platform for research: civil engineering, architecture and urbanism
Real-Time Turbidity Monitoring During Perimeter Dike Construction of the Poplar Island Dredged Material Placement Site, Chesapeake Bay, Maryland
Real-Time Turbidity Monitoring During Perimeter Dike Construction of the Poplar Island Dredged Material Placement Site, Chesapeake Bay, Maryland
Real-Time Turbidity Monitoring During Perimeter Dike Construction of the Poplar Island Dredged Material Placement Site, Chesapeake Bay, Maryland
Pine, F. (author) / Derrick-Creep, P. (author) / Ward, T. (author) / Walls, B. (author) / Randall, R. E. / Western Dredging Association / Texas A&M University
Technical conference; 19th, Western Dredging Association; thirty-first Texas A&M dredging seminar ; 1999 ; Louisville, KY
1999-01-01
18 pages
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Environmental Restoration and Enhancement using Dredged Material in Chesapeake Bay, Maryland
British Library Conference Proceedings | 1994
|Poplar Island Environmental Restoration Project: Dike Construction and Wetland Development
British Library Conference Proceedings | 2007
|Poplar Island Reclamation and Beneficial Uses of Dredged Material
British Library Conference Proceedings | 1994
|