LEGAL AND FINANCIAL CONSEQUENCES OF PERFORMING UNSPECIFIED DESIGN WORK IN SHIP-CONVERSION PROJECTS
LEGAL AND FINANCIAL CONSEQUENCES OF PERFORMING UNSPECIFIED DESIGN WORK IN SHIP-CONVERSION PROJECTS
LEGAL AND FINANCIAL CONSEQUENCES OF PERFORMING UNSPECIFIED DESIGN WORK IN SHIP-CONVERSION PROJECTS
Islam, C. (author) / Royal Institution of Naval Architects
International conference, Planning and managing shipbuilding, conversion and repair projects; RNIA ; 1999 ; London
1999-01-01
6 pages
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Optimal Plastic Design of Beams with Unspecified Actions or Reactions
Springer Verlag | 1989
|Optimal Structures with Unspecified Support Conditions: Some Numerical Results
British Library Conference Proceedings | 1997
|Legal - Understanding design responsibility on NHS projects
Online Contents | 2008
Projects and their consequences
TIBKAT | 2019
|