A platform for research: civil engineering, architecture and urbanism
Groundwater Control for Shaft and Tunnel Construction in Soft Ground at West Leg Interceptor Contracts 1R and 2, Cleveland, Ohio
Groundwater Control for Shaft and Tunnel Construction in Soft Ground at West Leg Interceptor Contracts 1R and 2, Cleveland, Ohio
Groundwater Control for Shaft and Tunnel Construction in Soft Ground at West Leg Interceptor Contracts 1R and 2, Cleveland, Ohio
Scotese, T. R. (author) / Auber, R. J. (author) / Hilton, D. E. / Samuelson, K.
Rapid excavation and tunneling conference ; 1999 ; Orlando, FL
1999-01-01
18 pages
Also known as RETC 1999
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Groundwater inflow problems in tunneling at west leg interceptor contract 3, Cleveland, Ohio
British Library Conference Proceedings | 1995
|Hilltop Interceptor Contract G Storage and Conveyance Tunnel, Cleveland, Ohio
British Library Conference Proceedings | 1997
|Dugway West Interceptor Relief Sewer Microtunneling CSO Project in Cleveland, Ohio
British Library Conference Proceedings | 2015
|Ground Improvements for CSO Connections to a Large Tunnel, Cleveland, Ohio
British Library Conference Proceedings | 2005
|British Library Conference Proceedings | 2007
|