A platform for research: civil engineering, architecture and urbanism
Tunnel Estimating by Probabilistic Scheduling
Tunnel Estimating by Probabilistic Scheduling
Tunnel Estimating by Probabilistic Scheduling
Panamerican conference; 12th, Soil mechanics and geotechnical engineering ; 2003 ; Cambridge, MA
2003-01-01
6 pages
Held in conjunction with the 39th U.S. Rock mechanics symposium
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Framework for Detailed Probabilistic Tunnel Cost Estimating
British Library Conference Proceedings | 2003
|ASCE | 2021
|ASCE | 2021
|Erratum for “Probabilistic Estimating”
ASCE | 2021
Probabilistic Optimal-Cost Scheduling
Online Contents | 2001
|