Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Tunnel Estimating by Probabilistic Scheduling
Tunnel Estimating by Probabilistic Scheduling
Tunnel Estimating by Probabilistic Scheduling
Likhitruangsilp, V. (Autor:in) / Ioannou, P. G. (Autor:in) / Culligan, P. J. / Einstein, H. H. / Whittle, A. J. / International Society for Soil Mechanics and Geotechnical Engineering
Panamerican conference; 12th, Soil mechanics and geotechnical engineering ; 2003 ; Cambridge, MA
01.01.2003
6 pages
Held in conjunction with the 39th U.S. Rock mechanics symposium
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Framework for Detailed Probabilistic Tunnel Cost Estimating
British Library Conference Proceedings | 2003
|ASCE | 2021
|ASCE | 2021
|Erratum for “Probabilistic Estimating”
ASCE | 2021
Probabilistic Optimal-Cost Scheduling
British Library Online Contents | 2001
|