A platform for research: civil engineering, architecture and urbanism
The DC WASA Anacostia River CSO Control Tunnel Project
The DC WASA Anacostia River CSO Control Tunnel Project
The DC WASA Anacostia River CSO Control Tunnel Project
Williamson, L. (author) / Benson, L.R. (author) / Girard, D.C. (author) / Bizzarri, R.E. (author) / Traylor, M.T. / Townsend, J.W. / Society for Mining, Metallurgy, and Exploration (U.S.)
Rapid excavation and tunneling conference ; 2007 ; Toronto, Canada
2007-01-01
9 pages
Also known as RETC. Held on CD-ROM
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
The DC WASA Anacostia River CSO Control Tunnel Project
British Library Conference Proceedings | 2007
|Anacostia River Tunnel Project: Engineering During CSO 019 Shafts and Connector Tunnel Construction
British Library Conference Proceedings | 2015
|Rehabilitative Grouting for the Anacostia River Tunnel
ASCE | 2017
|Sediment Erosion Characteristics in the Anacostia River
Online Contents | 2008
|Sediment Erosion Characteristics in the Anacostia River
British Library Online Contents | 2008
|