A platform for research: civil engineering, architecture and urbanism
Anacostia River Tunnel Project: Engineering During CSO 019 Shafts and Connector Tunnel Construction
Anacostia River Tunnel Project: Engineering During CSO 019 Shafts and Connector Tunnel Construction
Anacostia River Tunnel Project: Engineering During CSO 019 Shafts and Connector Tunnel Construction
Asadollahi, Pooyan (author) / Tzobery, Shimi (author) / Colton, Philip (author) / Taylor, Jonathan (author)
Rapid excavation and tunneling ; 2015 ; New Orleans, LA
2015-01-01
14 pages
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Rehabilitative Grouting for the Anacostia River Tunnel
ASCE | 2017
|The DC WASA Anacostia River CSO Control Tunnel Project
British Library Conference Proceedings | 2007
|The DC WASA Anacostia River CSO Control Tunnel Project
British Library Conference Proceedings | 2007
|British Library Conference Proceedings | 2019
|Large-Diameter Deep Shafts for the Deep Rock Tunnel Connector Project, Indianapolis, Indiana
British Library Conference Proceedings | 2013
|