A platform for research: civil engineering, architecture and urbanism
REAL-TIME DECISION-MAKING DURING FLOODS: APPLICATION TO THE UPPER RHONE RIVER IN SWITZERLAND
REAL-TIME DECISION-MAKING DURING FLOODS: APPLICATION TO THE UPPER RHONE RIVER IN SWITZERLAND
REAL-TIME DECISION-MAKING DURING FLOODS: APPLICATION TO THE UPPER RHONE RIVER IN SWITZERLAND
Jordan, F. (author) / Hernandez, J.G. (author) / Boillat, J.-L. (author) / Dubois, J. (author) / Schleiss, A. (author) / International Association of Hydraulic Engineering and Research / Consorzio per la Gestione del Centro di Coordinamento delle Ricerche Inerenti il Sistema Lagunare di Venezia
Congress; 32nd, International Association of Hydraulic Engineering and Research; Harmonizing the demands of art and nature in hydraulics ; 2007 ; Venice
2007-01-01
2 pages
Held on CD-ROM. Abstracts in print. CD-ROM in pocket attached inside back cover of vol. 2 of printed abstracts
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Moerel hydroelectric power plant on Rhone River, Switzerland
Engineering Index Backfile | 1946
|Development of head of Lavey at rhone river, Switzerland
Engineering Index Backfile | 1947
|Rhone River wooden bridge between Lavey and Moritz, Switzerland;
Engineering Index Backfile | 1941
|Flood management in the Upper Rhone River basin : from forecast to decision
British Library Online Contents | 2011
|British Library Conference Proceedings | 2002
|