A platform for research: civil engineering, architecture and urbanism
New Approach of ASFINAG for Tunnel Construction Monitoring of the Tauern Tunnel Project in Austria
New Approach of ASFINAG for Tunnel Construction Monitoring of the Tauern Tunnel Project in Austria
New Approach of ASFINAG for Tunnel Construction Monitoring of the Tauern Tunnel Project in Austria
Schnabl, R. (author) / Mayr, J.P. (author) / Almeraris, G. / Mariucci, B. / Society for Mining, Metallurgy, and Exploration (U.S.)
19th, Rapid excavation and tunneling conference ; 2009 ; Las Vegas, NV
2009-01-01
12 pages
Includes bibliographical references and index
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Repair of Tauern tunnel, Austria
Engineering Index Backfile | 1950
|Determining Fire Damage in the Tauern Tunnel
British Library Online Contents | 2000
First and second tube of the Tauern Tunnel
Wiley | 2010
Baumethodenentscheidung bei der Asfinag
Tema Archive | 2011
|