A platform for research: civil engineering, architecture and urbanism
Permitting and Construction of a Micro-hydroelectric Power Facility Utilizing Treated Mine Drainage
Permitting and Construction of a Micro-hydroelectric Power Facility Utilizing Treated Mine Drainage
Permitting and Construction of a Micro-hydroelectric Power Facility Utilizing Treated Mine Drainage
Page, B.J. (author) / Danehy, T.P. (author) / Busler, C.N.S.L. (author) / Denholm, C.F. (author) / Dunn, M.H. (author) / American Society of Mining and Reclamation
Annual Meeting; 29th, American Society of Mining and Reclamation ; 2012 ; Tupelo, MS
2013-01-01
425 pages
Also Known as ASMR; Includes bibliographical references and index
Conference paper
English
Mining , Reclamation , ASMR
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Permitting and Construction of a Micro-hydroelectric Power Facility Utilizing Treated Mine Drainage
British Library Conference Proceedings | 2013
|CONTROL PROGRAM OF HYDROELECTRIC POWER GENERATION FACILITY
European Patent Office | 2021
|Permitting of the Deep Creek Hydroelectric Project - a Paradigm for Cooperative Processes
British Library Conference Proceedings | 1997
|Pre-Construction Permitting Requirements
British Library Conference Proceedings | 2003
|