A platform for research: civil engineering, architecture and urbanism
Designer/Construction Manager/Contractor Perspective of Design and Construction of the New 72nd Street Station of the Second Avenue Subway
Designer/Construction Manager/Contractor Perspective of Design and Construction of the New 72nd Street Station of the Second Avenue Subway
Designer/Construction Manager/Contractor Perspective of Design and Construction of the New 72nd Street Station of the Second Avenue Subway
conference; 21st, Rapid excavation and tunneling ; 2013 ; Washington, DC
2013-01-01
11 pages
Includes bibliographical references and index; Also known as RETC 2013
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
British Library Conference Proceedings | 2015
|Construction of sixth avenue subway
Engineering Index Backfile | 1940
|Second Avenue Subway Project-History and Construction Challenges
British Library Conference Proceedings | 2004
|Construction of Sixth Avenue subway
Engineering Index Backfile | 1965
|