A platform for research: civil engineering, architecture and urbanism
Connecting Passage Construction for the Foundation Pit under Existing Optical Fiber Cable
Cao, H.Q. (author) / Lou, N. (author) / Cui, W.J. (author) / Li, Guangfan
International conference; 4th, Civil engineering, architecture and building materials; Advances in civil and industrial engineering IV: selected, peer reviewed papers from the 4th international conference (CEABM 2014); Part 3 ; 2014 ; Haikou, China
2014-01-01
6 pages
Includes bibliographical references and index. Part 3 of 4
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Connecting Passage Construction for the Foundation Pit under Existing Optical Fiber Cable
Trans Tech Publications | 2014
|European Patent Office | 2021
|Construction method for connecting newly-built cable trench and existing pipe gallery
European Patent Office | 2023
|European Patent Office | 2015
|Pile foundation pile repairing construction technology under existing pile foundation condition
European Patent Office | 2024
|