A platform for research: civil engineering, architecture and urbanism
Connecting Passage Construction for the Foundation Pit under Existing Optical Fiber Cable
Puli center project protects the original soil with pipe roof technology through combining the field analysis and finite element modeling while constructing the connecting passage of foundation pit under the existing optical fiber cable, so as to avoid the optical fiber cable from producing too big settlement to cause the adverse effect, and then constructs the connecting passage of foundation pit. After field monitoring, the maximum settlement of pipeline conforms to the deformation control standard of optical fiber cable, and this technology has certain innovation, which can provide reference for the similar project.
Connecting Passage Construction for the Foundation Pit under Existing Optical Fiber Cable
Puli center project protects the original soil with pipe roof technology through combining the field analysis and finite element modeling while constructing the connecting passage of foundation pit under the existing optical fiber cable, so as to avoid the optical fiber cable from producing too big settlement to cause the adverse effect, and then constructs the connecting passage of foundation pit. After field monitoring, the maximum settlement of pipeline conforms to the deformation control standard of optical fiber cable, and this technology has certain innovation, which can provide reference for the similar project.
Connecting Passage Construction for the Foundation Pit under Existing Optical Fiber Cable
Applied Mechanics and Materials ; 580-583 ; 2266-2271
2014-07-04
6 pages
Article (Journal)
Electronic Resource
English
Connecting Passage Construction for the Foundation Pit under Existing Optical Fiber Cable
British Library Conference Proceedings | 2014
|European Patent Office | 2021
|Construction method for connecting newly-built cable trench and existing pipe gallery
European Patent Office | 2023
|European Patent Office | 2015
|Pile foundation pile repairing construction technology under existing pile foundation condition
European Patent Office | 2024
|