A platform for research: civil engineering, architecture and urbanism
Using an Existing Tunnel to Dewater the St. Peter Sandstone
Using an Existing Tunnel to Dewater the St. Peter Sandstone
Using an Existing Tunnel to Dewater the St. Peter Sandstone
Zimmermann, Joshua T. (author) / Pullen, Thomas S. (author)
Geo-Congress
2020-01-01
10 pages
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Engineering Index Backfile | 1943
|Engineering Index Backfile | 1933
Wellpoints dewater below sea level
Engineering Index Backfile | 1948
|Engineering Index Backfile | 1930