A platform for research: civil engineering, architecture and urbanism
Two-Component Backfill Grouting at the Three Rivers Protection and Overflow Reduction Tunnel: Above and Below Ground Challenges and Solutions
Two-Component Backfill Grouting at the Three Rivers Protection and Overflow Reduction Tunnel: Above and Below Ground Challenges and Solutions
Two-Component Backfill Grouting at the Three Rivers Protection and Overflow Reduction Tunnel: Above and Below Ground Challenges and Solutions
Salazar, Cristina Oñate (author) / Murt, Tanner (author) / Chiappalone, Francesco (author) / Waddell, Lance (author)
Rapid Excavation and Tunneling ; 2021 ; Las Vegas
2021-01-01
11 pages
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
British Library Conference Proceedings | 2019
|Backfill grouting research at Groene Hart Tunnel
British Library Conference Proceedings | 2009
|Shield tunnel timed condensation backfill grouting material formula and grouting process
European Patent Office | 2022
|Deformation Properties of Backfill Grouting in Shield Tunnel
British Library Online Contents | 2009
|