A platform for research: civil engineering, architecture and urbanism
Power point: Increasingly tough waste incineration regulations and the push to develop alternatives to coal fired electricity are forcing councils to develop waste to energy plants
Power point: Increasingly tough waste incineration regulations and the push to develop alternatives to coal fired electricity are forcing councils to develop waste to energy plants
Power point: Increasingly tough waste incineration regulations and the push to develop alternatives to coal fired electricity are forcing councils to develop waste to energy plants
NEW CIVIL ENGINEER ; 16-17
2 pages
Article (Journal)
English
DDC:
624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Environmental requirements push industry to develop acceptable alternatives
Online Contents | 1998
ABB, Italian refinery to develop 220-MW plant fired by waste oil
Online Contents | 1993
British Library Online Contents | 1997
|Coal-fired boiler co-processing technology for waste incineration fly ash
European Patent Office | 2023
|