A platform for research: civil engineering, architecture and urbanism
The Construction of Bridge Abutment Relieved of Back Thrust from Approach Embankment
The Construction of Bridge Abutment Relieved of Back Thrust from Approach Embankment
The Construction of Bridge Abutment Relieved of Back Thrust from Approach Embankment
Ray, S. K. (author)
1998-01-01
2 pages
Article (Journal)
English
DDC:
624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Integral Bridge Abutment - Approach Embankment Interaction
British Library Conference Proceedings | 2010
|EMBANKMENT CONTRUCTION METHOD FOR BACK SURFACE AREA OF ABUTMENT, AND EMBANKMENT STRUCTURE
European Patent Office | 2019
|Waste tire grating reinforced rib type bridge abutment embankment structure and construction method
European Patent Office | 2023
|Design Considerations of Bridge Abutment Piles Subjected to Embankment Settlement
British Library Conference Proceedings | 1999
|Construction method for backfilling abutment back of light foam concrete bridge abutment
European Patent Office | 2023
|