A platform for research: civil engineering, architecture and urbanism
EMBANKMENT CONTRUCTION METHOD FOR BACK SURFACE AREA OF ABUTMENT, AND EMBANKMENT STRUCTURE
Provided are a method for constructing an embankment for a back surface area (BA) of an abutment, and an embankment structure (100) therefor, which provide the function of discharging a torrent of water during flooding, thereby preventing erosion or scouring of the back surface area (BA) of the abutment due to the river flow, and provide strong durability in which dangerous damage due to flood torrents is not exhibited. An integrated reinforcing material gabion (110) is formed by a gabion (111) installed at a side edge of the back surface area (BA) of the abutment and a reinforcing material (112) spreading from the bottom surface of this gabion (111), a reinforcing aggregate material (120) is compacted atop the reinforcing material (112), the gabion (111) is filled with a water-discharging aggregate material (130), thereby constructing a gabion installation layer (110A), and gabion installation layers (110A) are stacked sequentially to approximately the same height as a bridge (B1), thereby constructing an integrated embankment structure (100). Also provided are an embankment construction method and an embankment structure therefor with which these integrated reinforcing material gabions (110) can be arranged facing each other in the transverse direction of the back surface area (BA) of the abutment.
L'invention concerne un procédé de construction d'un talus destiné à une surface arrière (BA) d'une butée, et une structure de talus (100) associée, qui assurent la fonction de déversement d'un torrent d'eau pendant l'inondation, ce qui permet d'empêcher l'érosion ou l'affouillement de la surface arrière (BA) de la butée en raison de l'écoulement d'une rivière, et offrant une durabilité élevée selon laquelle l'absence de dégradation dangereuse due à des torrents d'inondation est démontrée. Un mur gabion à matériau de renforcement intégré (110) est composé d'un mur gabion (111) installé au niveau d'un bord latéral de la surface arrière (BA) de la butée et d'un matériau de renforcement (112) s'étendant à partir de la surface inférieure de ce mur gabion (111), un matériau d'agrégat de renforcement (120) est compacté au-dessus du matériau de renforcement (112), le mur gabion (111) est rempli d'un matériau d'agrégat d'évacuation d'eau (130), ce qui permet de construire une couche d'installation de mur gabion (110A), et des couches d'installation de mur gabion (110A) sont empilées séquentiellement pour atteindre approximativement la même hauteur qu'un pont (B1), ce qui permet de construire une structure de talus intégrée (100). L'invention porte également sur un procédé de construction de talus et sur une structure de talus associées, grâce auxquels ces murs gabions à matériau de renforcement intégré peuvent être disposés en regard les uns des autres en direction transversale de la surface arrière (BA) de la butée.
洪水時にその奔流の排水機能を発揮して河川流による橋台背面領域(BA)の浸食や洗堀を抑制し、洪水奔流による脆性的な破壊を呈しない粘り強い強靭な耐久性を発揮する橋台背面領域(BA)の盛土構築工法およびその盛土構造体(100)を提供すること。橋台背面領域(BA)の側縁に設置するふとん籠(111)とこのふとん籠(111)の底面から敷設する補強材(112)とで補強材一体型ふとん籠(110)を構成し、補強材(112)の上に補強用骨材材料(120)を締め固め、ふとん籠(111)に排水用骨材材料(130)を充填してふとん籠設置層(110A)を造成し、橋梁(B1)と同程度の高さまでふとん籠設置層(110A)を順次積層して一体化した盛土構造体(100)を構築する。更にこの補強材一体型ふとん籠(110)を橋台背面領域(BA)の横断方向で相互に対向配置することも可能な盛土構築工法およびその盛土構造体。
EMBANKMENT CONTRUCTION METHOD FOR BACK SURFACE AREA OF ABUTMENT, AND EMBANKMENT STRUCTURE
Provided are a method for constructing an embankment for a back surface area (BA) of an abutment, and an embankment structure (100) therefor, which provide the function of discharging a torrent of water during flooding, thereby preventing erosion or scouring of the back surface area (BA) of the abutment due to the river flow, and provide strong durability in which dangerous damage due to flood torrents is not exhibited. An integrated reinforcing material gabion (110) is formed by a gabion (111) installed at a side edge of the back surface area (BA) of the abutment and a reinforcing material (112) spreading from the bottom surface of this gabion (111), a reinforcing aggregate material (120) is compacted atop the reinforcing material (112), the gabion (111) is filled with a water-discharging aggregate material (130), thereby constructing a gabion installation layer (110A), and gabion installation layers (110A) are stacked sequentially to approximately the same height as a bridge (B1), thereby constructing an integrated embankment structure (100). Also provided are an embankment construction method and an embankment structure therefor with which these integrated reinforcing material gabions (110) can be arranged facing each other in the transverse direction of the back surface area (BA) of the abutment.
L'invention concerne un procédé de construction d'un talus destiné à une surface arrière (BA) d'une butée, et une structure de talus (100) associée, qui assurent la fonction de déversement d'un torrent d'eau pendant l'inondation, ce qui permet d'empêcher l'érosion ou l'affouillement de la surface arrière (BA) de la butée en raison de l'écoulement d'une rivière, et offrant une durabilité élevée selon laquelle l'absence de dégradation dangereuse due à des torrents d'inondation est démontrée. Un mur gabion à matériau de renforcement intégré (110) est composé d'un mur gabion (111) installé au niveau d'un bord latéral de la surface arrière (BA) de la butée et d'un matériau de renforcement (112) s'étendant à partir de la surface inférieure de ce mur gabion (111), un matériau d'agrégat de renforcement (120) est compacté au-dessus du matériau de renforcement (112), le mur gabion (111) est rempli d'un matériau d'agrégat d'évacuation d'eau (130), ce qui permet de construire une couche d'installation de mur gabion (110A), et des couches d'installation de mur gabion (110A) sont empilées séquentiellement pour atteindre approximativement la même hauteur qu'un pont (B1), ce qui permet de construire une structure de talus intégrée (100). L'invention porte également sur un procédé de construction de talus et sur une structure de talus associées, grâce auxquels ces murs gabions à matériau de renforcement intégré peuvent être disposés en regard les uns des autres en direction transversale de la surface arrière (BA) de la butée.
洪水時にその奔流の排水機能を発揮して河川流による橋台背面領域(BA)の浸食や洗堀を抑制し、洪水奔流による脆性的な破壊を呈しない粘り強い強靭な耐久性を発揮する橋台背面領域(BA)の盛土構築工法およびその盛土構造体(100)を提供すること。橋台背面領域(BA)の側縁に設置するふとん籠(111)とこのふとん籠(111)の底面から敷設する補強材(112)とで補強材一体型ふとん籠(110)を構成し、補強材(112)の上に補強用骨材材料(120)を締め固め、ふとん籠(111)に排水用骨材材料(130)を充填してふとん籠設置層(110A)を造成し、橋梁(B1)と同程度の高さまでふとん籠設置層(110A)を順次積層して一体化した盛土構造体(100)を構築する。更にこの補強材一体型ふとん籠(110)を橋台背面領域(BA)の横断方向で相互に対向配置することも可能な盛土構築工法およびその盛土構造体。
EMBANKMENT CONTRUCTION METHOD FOR BACK SURFACE AREA OF ABUTMENT, AND EMBANKMENT STRUCTURE
PROCÉDÉ DE CONSTRUCTION DE TALUS DESTINÉ À UNE SURFACE ARRIÈRE DE BUTÉE, ET STRUCTURE DE TALUS
橋台背面領域の盛土構築工法およびその盛土構造体
KAWAJIRI SHUNZO (author) / KAWAGUCHI TAKAYUKI (author) / KURACHI YOSHINAO (author)
2019-10-31
Patent
Electronic Resource
Japanese
Seismic embankment-abutment-structure interaction of integral abutment bridges
BASE | 2011
|Integral Bridge Abutment - Approach Embankment Interaction
British Library Conference Proceedings | 2010
|The Construction of Bridge Abutment Relieved of Back Thrust from Approach Embankment
British Library Online Contents | 1998
|EMBANKMENT REINFORCEMENT STRUCTURE AND EMBANKMENT REINFORCEMENT METHOD
European Patent Office | 2024
|