A platform for research: civil engineering, architecture and urbanism
Ghaggar Bridge on NH-1, at KM 212.20 Dismantling of Bottom Plug - A Case Study
Ghaggar Bridge on NH-1, at KM 212.20 Dismantling of Bottom Plug - A Case Study
Ghaggar Bridge on NH-1, at KM 212.20 Dismantling of Bottom Plug - A Case Study
Singh, A. P. (author) / Gupta, A. K. (author)
INDIAN HIGHWAYS ; 28 ; 23-30
2000-01-01
8 pages
Article (Journal)
English
DDC:
625.7
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Railway bridge bottom inspection vehicle track dismantling tool and method
European Patent Office | 2024
|Integrated prefabricated bridge dismantling machine and prefabricated bridge dismantling method
European Patent Office | 2021
|Cofferdam-based tied-arch bridge dismantling structure and bridge dismantling method
European Patent Office | 2021
|