A platform for research: civil engineering, architecture and urbanism
Cost Optimization in Projects with Repetitive Nonserial Activities
Cost Optimization in Projects with Repetitive Nonserial Activities
Cost Optimization in Projects with Repetitive Nonserial Activities
Hegazy, T. (author) / Wassef, N. (author)
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT ; 127 ; 183-191
2001-01-01
9 pages
Article (Journal)
English
DDC:
624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Hybrid Time-Cost Optimization of Nonserial Repetitive Construction Projects
British Library Online Contents | 2009
|A time-cost trade-off algorithm for nonserial linear projects
Online Contents | 1996
|A time-cost trade-off algorithm for nonserial linear projects
British Library Online Contents | 1996
|Scheduling of nonserial linear projects with multiple non-overlapped loop structures
Online Contents | 1995
|SCHEDULING OF NONSERIAL LINEAR PROJECTS WITH MULTIPLE NON-OVERLAPPED LOOP STRUCTURES
Taylor & Francis Verlag | 1995
|