A platform for research: civil engineering, architecture and urbanism
A time-cost trade-off algorithm for nonserial linear projects
A time-cost trade-off algorithm for nonserial linear projects
A time-cost trade-off algorithm for nonserial linear projects
Senouci, A. B. (author) / Eldin, N. N. (author)
CANADIAN JOURNAL OF CIVIL ENGINEERING ; 23 ; 134-149
1996-01-01
16 pages
Article (Journal)
English
DDC:
624
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
A time-cost trade-off algorithm for nonserial linear projects
Online Contents | 1996
|Cost Optimization in Projects with Repetitive Nonserial Activities
British Library Online Contents | 2001
|Hybrid Time-Cost Optimization of Nonserial Repetitive Construction Projects
British Library Online Contents | 2009
|Scheduling of nonserial linear projects with multiple non-overlapped loop structures
Online Contents | 1995
|SCHEDULING OF NONSERIAL LINEAR PROJECTS WITH MULTIPLE NON-OVERLAPPED LOOP STRUCTURES
Taylor & Francis Verlag | 1995
|